Optimising material procurement for construction waste minimization: An exploration of success factors

Saheed O. Ajayi, Lukumon O. Oyedele, Olugbenga O. Akinade, Muhammad Bilal, Hafiz A. Alaka, Hakeem A. Owolabi

Research output: Contribution to JournalArticlepeer-review

Abstract

Although construction waste occurs during the actual construction activities, there is an understanding that it is caused by activities and actions at design, materials procurement and construction stages of project delivery processes. This study investigates the material procurement and logistics measures for mitigating waste generated by construction activities. In a bid to explore the phenomenon from the perspectives of experts from the construction industry, this study used a combination of descriptive interpretive research and survey approach as its methodological framework. The study suggests that four features characterised waste efficient logistic and procurement process. These include suppliers’ commitment to low waste measures, low waste purchase management, effective materials delivery management and waste efficient Bill of Quantity. In addition, the key requisite strategies for mitigating construction waste through materials procurement include commitment to take back scheme, procurement of waste efficient materials/technology and use of minimal packaging. The use of Just-in-Time (JIT) delivery system and prevention of over ordering are also important for mitigating waste through materials procurement processes. These implies that while the key measures are critical success factors for reducing waste through procurement process, the four established features are required of all procurement process. Measures through which the procurement process could enhance waste efficiency are further highlighted and discussed in the paper. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at design and construction stages of project delivery process.
Original languageEnglish
Pages (from-to)38-46
Number of pages9
JournalSustainable Materials and Technologies
Volume11
Early online date7 Jan 2017
DOIs
Publication statusE-pub ahead of print - 7 Jan 2017
Externally publishedYes

Keywords

  • Construction waste
  • Landfill
  • Materials delivery
  • Materials take-off
  • Phenomenology
  • Purchase management
  • Waste efficient procurement