Production of a suitable RT(CR) procedure to ensure the ASTM E2445-14 standard is met

D P Mapletoft, Abdeldjalil Bennecer, Philip Picton

Research output: Contribution to conference typesPaperResearchpeer-review

Abstract

Having found that the current Computed Radiography test phantom failed to meet the ASTM E2445-14 standard, a new process was required. The Carestream diagnostics tool, after some changes were made to the Radiographic exposure, met most of the requirements. Full ASTM compliance has been achieved after the development of a further exposure. The full procedure was drafted and tested, followed by independent validation and verification by Radiographic Testing Level 3 personnel.
Original languageEnglish
Publication statusAccepted/In press - 13 Jun 2018
EventInternational Conference on Robotics, Automation and Non-Destructive Evaluation - Chennai, India
Duration: 3 Jan 0001 → …
https://hindustanuniv.ac.in/anro/rane/rane.html

Conference

ConferenceInternational Conference on Robotics, Automation and Non-Destructive Evaluation
Period3/01/01 → …
Internet address

Fingerprint

Radiography
Compliance

Cite this

Mapletoft, D. P., Bennecer, A., & Picton, P. (Accepted/In press). Production of a suitable RT(CR) procedure to ensure the ASTM E2445-14 standard is met. Paper presented at International Conference on Robotics, Automation and Non-Destructive Evaluation, .
Mapletoft, D P ; Bennecer, Abdeldjalil ; Picton, Philip. / Production of a suitable RT(CR) procedure to ensure the ASTM E2445-14 standard is met. Paper presented at International Conference on Robotics, Automation and Non-Destructive Evaluation, .
@conference{af5f97fd416c4408b0efd5c4d15aa129,
title = "Production of a suitable RT(CR) procedure to ensure the ASTM E2445-14 standard is met",
abstract = "Having found that the current Computed Radiography test phantom failed to meet the ASTM E2445-14 standard, a new process was required. The Carestream diagnostics tool, after some changes were made to the Radiographic exposure, met most of the requirements. Full ASTM compliance has been achieved after the development of a further exposure. The full procedure was drafted and tested, followed by independent validation and verification by Radiographic Testing Level 3 personnel.",
author = "Mapletoft, {D P} and Abdeldjalil Bennecer and Philip Picton",
year = "2018",
month = "6",
day = "13",
language = "English",
note = "International Conference on Robotics, Automation and Non-Destructive Evaluation ; Conference date: 03-01-0001",
url = "https://hindustanuniv.ac.in/anro/rane/rane.html",

}

Mapletoft, DP, Bennecer, A & Picton, P 2018, 'Production of a suitable RT(CR) procedure to ensure the ASTM E2445-14 standard is met' Paper presented at International Conference on Robotics, Automation and Non-Destructive Evaluation, 3/01/01, .

Production of a suitable RT(CR) procedure to ensure the ASTM E2445-14 standard is met. / Mapletoft, D P; Bennecer, Abdeldjalil; Picton, Philip.

2018. Paper presented at International Conference on Robotics, Automation and Non-Destructive Evaluation, .

Research output: Contribution to conference typesPaperResearchpeer-review

TY - CONF

T1 - Production of a suitable RT(CR) procedure to ensure the ASTM E2445-14 standard is met

AU - Mapletoft, D P

AU - Bennecer, Abdeldjalil

AU - Picton, Philip

PY - 2018/6/13

Y1 - 2018/6/13

N2 - Having found that the current Computed Radiography test phantom failed to meet the ASTM E2445-14 standard, a new process was required. The Carestream diagnostics tool, after some changes were made to the Radiographic exposure, met most of the requirements. Full ASTM compliance has been achieved after the development of a further exposure. The full procedure was drafted and tested, followed by independent validation and verification by Radiographic Testing Level 3 personnel.

AB - Having found that the current Computed Radiography test phantom failed to meet the ASTM E2445-14 standard, a new process was required. The Carestream diagnostics tool, after some changes were made to the Radiographic exposure, met most of the requirements. Full ASTM compliance has been achieved after the development of a further exposure. The full procedure was drafted and tested, followed by independent validation and verification by Radiographic Testing Level 3 personnel.

M3 - Paper

ER -

Mapletoft DP, Bennecer A, Picton P. Production of a suitable RT(CR) procedure to ensure the ASTM E2445-14 standard is met. 2018. Paper presented at International Conference on Robotics, Automation and Non-Destructive Evaluation, .