Skip to main navigation
Skip to search
Skip to main content
University of Northampton's Research Explorer Home
Help & FAQ
Link opens in a new tab
Search content at University of Northampton's Research Explorer
Home
Researchers
Research Outputs
Research Units
Projects
Equipment
Student Theses
Impacts
Activities
Datasets
Press/Media
Prizes
Repairing a shield tunnel damaged by secondary grouting.
Liu Jin-long
, Omar Hamza
*
, S. Davies-Vollum
, Liu Jie-qun
*
Corresponding author for this work
Research output
:
Contribution to Journal
›
Article
›
peer-review
Overview
Fingerprint
Fingerprint
Dive into the research topics of 'Repairing a shield tunnel damaged by secondary grouting.'. Together they form a unique fingerprint.
Sort by
Weight
Alphabetically
Keyphrases
Shield Tunnel
100%
Secondary Grouting
100%
Grouting
50%
Tunnel Segments
50%
Repair Work
50%
China
25%
Affected Area
25%
Survey Data
25%
Large Volume
25%
Ground Penetrating Radar
25%
Ground Conditions
25%
Grouting Pressure
25%
Track Segments
25%
Secondary Survey
25%
Structural Repair
25%
Hefei City
25%
Minimum Disturbance
25%
Shielding Method
25%
Tunnel Leakage
25%
Synchronous Grouting
25%
Metro Tunnel
25%
Segmentation Cracks
25%
Injection Pressure
25%
Maintenance Inspection
25%
Track Displacement
25%
Regular Maintenance
25%
Simplification Strategies
25%
Geostatic Pressure
25%
Grouting Works
25%
Engineering
Repair Work
100%
Affected Zone
50%
Injection Pressure
50%
Grouting Pressure
50%
Metro Tunnels
50%
Structural Repair
50%
Grout
50%
Case Study
50%